One contract, from bare floor to live operations.

Since 2006, ITTAS has delivered offices, contact centres, data centres and branch networks for Egypt's leading companies. Every trade in-house, one accountable team.

Plate
1 of 4
Project
Amazon, Maadi Technology Park
Location
Technology Village, Maadi
Programme
Jun 2018 – Jul 2019
Trades Fit-out · MEP · NetworkOpen this project file

Companies we have worked with

In practice since
2006
Projects delivered
80+
Operator seats built
1,500+
Handed over on time
100%

Work we have handed over

A representative sample since 2018: corporate interiors, contact centres, data rooms and branch networks for Egypt's leading operators.

Showing all 6 projects

  1. Open-plan office with rows of white desks, frosted glass screens and an exposed services ceilingHanded overJul 2019

    Amazon, Maadi Technology Park

    Location
    Technology Village, Maadi
    Handed over
    Jul 2019
    Area
    1,250 m² in Phase 1
    Trades
    Fit-outMEPNetwork
    Open file
  2. Data hall with a raised white floor, rows of server cabinets and overhead cable traysHanded over

    Raya Contact Center, Abbassaya Tower

    Location
    Abbassaya, Cairo
    Programme
    40–60 days per floor
    Area
    950 m² per floor
    Trades
    Fit-outNetwork
    Open file
  3. Red manual fire alarm call point and sign on a concrete wallHanded overDec 2022

    Concentrix, Hurghada Campus

    Location
    Hurghada, Red Sea
    Handed over
    Dec 2022
    Area
    2,800 m² in total
    Trades
    Fit-outMEP
    Open file
  4. Long white service counter under spotlights in a dark-walled hallHanded overFeb 2022

    Fawry Plus, National Rollout

    Location
    Seven governorates
    Handed over
    Feb 2022
    Area
    770 m² across 7 branches
    Trades
    Fit-out
    Open file
  5. Staff canteen servery with two counters, a chilled drinks display and menu screensHanded overMar 2023

    Raya, Main Cafeteria and Roof

    Location
    6th of October City
    Handed over
    Mar 2023
    Area
    1,100 m²
    Trades
    Civil worksFit-outMEP
    Open file
  6. Bright open-plan floor with rows of staff working at desks under ceiling lightsHanded overOct 2022

    Raya, Third Floor Renovation

    Location
    6th of October City
    Handed over
    Oct 2022
    Area
    500 m²
    Trades
    Fit-out
    Open file

Also delivered

  • Operations rooms

    Two matching 110-seat rooms of 400 m² each, each turned around in fifteen days.

    Raya · Holding, 1st and 4th floors · 2021 and 2023

  • FCU control panels

    90 control panels installed across the whole building in twenty days, with no impact on operations.

    Raya · Smart Village · Jun 2023

  • Rapid deployment

    Training rooms of 20 positions each, mobilised, built and cleared in under twelve hours.

    Single-day jobs · When required

Every trade in-house. One team answering for all of them.

Civil works

Structural and architectural works, including inside buildings that stay open.

  • Excavation
  • Shell works
  • Blockwork
  • Structural modifications in live buildings
Concrete columns with reinforcement bars rising against the sky

Interior finishing

Interiors finished to hospitality-grade standards.

  • Gypsum ceilings and partitions
  • Glass systems
  • Joinery
  • Flooring
  • Final coatings
Finished loft office with timber columns, white workstations and exposed ductwork

Electro-mechanical

Power, air and life-safety systems, integrated as one.

  • Power distribution
  • HVAC controls
  • Lighting and UPS systems
  • Fire detection
  • FM-200 fire suppression
Spiral ductwork and ceiling lights in a dark ceiling void

Network infrastructure

From structured cabling to a working data centre.

  • Structured cabling
  • IDF and MDF rooms
  • Active and passive components
  • Data centre build-out
  • Mission-critical backbone
Fibre-optic patch leads plugged into a network switch in a rack
Facilities maintenance
Preventive programmes that look after the environments we deliver.
Material supply
Sourcing, logistics and certified installation of specified materials.

What one contract changes

With separate contractors, each trade waits for the one before it, and every interface between them becomes a dispute. ITTAS holds every trade in-house, so civil works, MEP, cabling and finishes run as one programme under one accountable lead.

Illustrative programme, in months

Separate contractors

  1. Civil worksMonth 1–10
  2. MEPMonth 12–18
  3. Fit-outMonth 20–25
  4. HandoverMonth 26

One ITTAS contract

  1. Civil worksMonth 1–10
  2. MEPMonth 6–15
  3. Fit-outMonth 10–19
  4. HandoverMonth 20

Why clients choose ITTAS

Single-source accountability
Every trade in-house. One contract, one programme, one team answerable for the outcome.
Programme certainty
A record of handing over within the committed window, even on aggressive timeframes.
Live environments
Work that cannot disrupt the operations next to it, including live data centre relocations.
Specification discipline
We build to the specification that was signed, not a cheaper version that appears mid-programme.
National footprint
From Cairo and Giza to Hurghada, Damietta and Kafr El Sheikh: the same standard in every governorate.
Discretion
We don't photograph freely, market loudly or discuss engagements without permission.

Have a building, a floor or a fit-out coming up?

Call or message us with the location, the scope and your target date.